Changes

Jump to navigation Jump to search

SB-6E Bonder

474 bytes removed, 1 year ago
# A tool engineer will schedule a time for training and/or checkout.
# Schedule a checkout session with a tool engineer via the helpdesk ticket system. If this checkout is successful, the engineer will authorize you on the tool.
 
==Maintenance==
*Anodic baseline run done monthly on 4" wafers
*chamber opened and cleaned Semi annually or as needed
*chucks cleaned every time they're changed or as needed
*clamp and spacer calibration checked bimonthly
*pressure uniformity tested as needed or when requested
===Process name===
<!-- This is an example a chart published with etch data. You can just replace the url with your own. -->
{{#widget:Iframe
|url=chart url
|width=800
|height=400
|border=0
}}
OnlineAccess, PhysicalAccess, Staff, StoreManager, StoreUser, Bureaucrats, Interface administrators, Administrators, Widget editors
2,126

edits

Navigation menu